|
Product Details:
Payment & Shipping Terms:
|
Item Name: | Flange | Material: | Stainless Steel |
---|---|---|---|
Process: | Investment Casting | Tolerance: | 0.1-0.5 |
Finish: | Polishing | OEM: | Available |
Precision Stainless Steel Investment Casting Flange
Product Details
Name | Custom Precision Casting Parts |
Material | Stainless Steel: CF8, CF8M, G-X6CrNiMo1810, G-X7CrNiNb1189, SUS 304, 304L, 316, 316L |
Carbon Steel: Low carbon steel, middle carbon steel, G35, G45, WCB, WCA, WCC, ISO 340-550 | |
Alloy Carbon Steel: G25CrMo4, Heat Resistant Steel | |
Or according to customer requirement | |
Surface Treatment |
Shot/sandblast, Polishing, Surface passivation, Primer Painting, Powder coating, ED- Coating, Chromate Plating, Zinc-plated, Dacromat coating |
Process | Investment Casting / Lost Wax Casting |
Software | PRO/E, Auto CAD, Solid Works, UG, CAM |
Certificate | CE, TUV, SGS or as your requirement to do test by the third party |
Lead Time |
25-30 days for sample, 35-40 days for bulk order |
Packing | Plywood pallet, plywood box or as per your requirement |
Production Process
About Us
Sunrise Foundry is a professional Metal Foundry, located in Ningbo. We have been producing Gray Iron,
Ductile Iron Castings and and any other precision castings for more than 25 years.
We are dedicated to meet different requirements of various customers across the world, products are mainly
involved Agricultural and Construction Machinery, Hydraulic, Mining industry, Municipal Products, some steel
and stainless steel castings for Pumps and Valves, Pipe Fittings, etc.
Please feel free to contact us if you have any requests.
Quality Control
FAQ
Why Choose Us
1. Our strong R & D and QC department can control the products to meet your strict requirement.
2. Different kinds of finish available, like anodized, power coating, painting, polishing, plating, etc.
3. Different dimensions according to the client's request.
4. Can provide various sizes and packing according to specific requirements.
5. We offer the engineer consultation to your design for production improvement and cost saving.
6. Customized and tailored orders are welcome.
7. High quality and delivery on time.
8. Long-term cooperation with international famous enterprises.
FAQ
How about your delivery time ?
15-20 days for glass fittings. 25-30 days for OEM fittings .
Contact Person: Paul