![]() |
|
Sales & Support
Request A Quote - Email
Select Language
|
|
Product Details:
Payment & Shipping Terms:
|
Material: | Stainless Steel | Application: | Pipe Fittings |
---|---|---|---|
Process: | Lost Wax Casting | Finish: | Sandblasting |
Size: | Customized | Quality Control: | 100% Inspected |
Precision Casting Silica Sol Casting 304 Stainless Steel Casting Parts
Product Details
Material | Stainless Steel 304, 304L, 316, 316L; Carbon Steel, Alloy Steel, Cast Iron,etc |
Surface Treatment |
Antirust oil, Plating, Paint, Powder Coating, Polishing, etc |
Manufature Processes |
Confirmation Drawings - Open Tooling - Sample Approval - Incoming Qulity Check - Casting - Fix the burrs - Drilling and Threasing - CNC Machining - Polishing - Internal Process Quality Check - Surface Treatment - Packing - Outgoing Quality Check - Shipping |
Product Weight | 0.001KG - 30KG |
Casting tolerance |
VDG Merkblad P690 |
Surface Roughness |
Ra0.8~Ra6.3 |
Drawing format | We accept DXF,DWG,IGS,STEP, and so on |
Terms of trade | EXW, FOB, CIF |
Lead Time | 20-25 days after order confirmed or as your request |
Packing | Single polybag, bubble bags, wooden case, carton box, or as your requests |
Logo | Can be made as your own logo, your own brand |
After-sales Service |
We will follow up every customer and solve all problems satisfied after sale |
Production Process
Quality Control
Sunrise Foundry is to provide high quality components with competitive price. Each part will be strickly machined to the print.
Youlin is committed continually improves the effectiveness of the quality management system (QMS) and sets quality objectives and continuous improvement plans.
Youlin is committed introducing all staff to its quality policy and quality systems,to familiarize themselves with the QMS and strive to continue to improve upon the quality, capability and work environment.
FAQ
Q: Can I ask for special designs?
A: Sure.Customized are available for us.
Q: How long is the delivery time?
A: Generally 30-45 days for production according to the quantity,
Q: How about installation and commission overseas?How long will it take ?
A: we supply overseas service , customer only needs to arrange for the engineers' flight tickets and hotel,food
Small machine usually takes within 3-5 days .Whole production line usually takes about 10-15 days.
Q: What is the terms of payment ?
A: L/C is available for our company.If TT terms,30% T/T in advance ,balance 65% before shipment and 5% after installment.
Contact Person: Paul