Place of Origin: | Mainland China |
Brand Name: | NC9835 |
Certification: | ISO9001,CE,SGS |
Model Number: | 9835 |
Minimum Order Quantity: | 100 pcs |
---|---|
Price: | Can talk |
Packaging Details: | Wooden Case |
Delivery Time: | 35 days |
Payment Terms: | T/T, L/C |
Supply Ability: | 100 pcs |
Item Name: | Tee | Application: | Pipe Fittings |
---|---|---|---|
Material: | Stainless Steel | Process: | Precision Casting |
Size: | As Per Drawing | Inspection: | 100% |
Precision 304 316 Stainless Steel Sanitary Pipe Fittings 360 Degree Butt Welded Y Type Tee Casting
Product Details
Production Process
Factory Introduction
Sunrise Foundry is a professional Metal Foundry, located in Ningbo. We have been producing Gray Iron,
Ductile Iron Castings and and any other precision castings for more than 25 years.
We are dedicated to meet different requirements of various customers across the world, products are mainly
involved Agricultural and Construction Machinery, Hydraulic, Mining industry, Municipal Products, some steel
and stainless steel castings for Pumps and Valves, Pipe Fittings, etc.
Please feel free to contact us if you have any requests.
Our Service
1) Design assistance and full engineering support .
2) Professional at OEM parts .
3) Excellent after sales service.
4) Advanced machine tools, CAD programming software.
5) Prototype machining capabilities.
6) Strict quality control standards with a highly qualified inspection department .
7) Continually upgrading and advancing our equipment to remain competitive .
8)The company has hundreds of processing machines and related quality testing instruments to ensure the shortest delivery time.
9) Small quality is also available.
FAQ
How long is the new product development cycle?
The mold making period of new product is 30 days.
What's the time for new product sample making?
20 days.
How to ensure product quality?
Using the national table pig iron, the molten iron was detected by the rapid analyzer before the smelting time,
and the material was adjusted.
What’s the inspection equipment ?
There are fast analyzer before furnace, hardness tester, tensile testing machine,
product testing equipment is complete.
How long will the batch production take?
The new product can be produced in bulk within 25 days after the confirmation of the new product, and a container can be completed every month
Contact Person: Mr. Paul
Tel: +86-15867869948
Fax: 86-574-88923602
High Precision Investment Castings Transmission Box Cover For Power Transmission Machinery
Durable Grey Cast Iron Casting Cummins Exhaust Manifold For Diesel Engine / Cars Turbo
Customized Superior Quality Cast Iron Park Bench Legs for Outdoor Street Garden Furniture
Custom Cast Iron Hydraulic Cylinder Clevis Mount Cylinder End Mount For Truck Crane Forklift
Truck Parts Body Ductile Cast Iron Die Mold Sand Casting Process Engine Transmission Housing
CE AISI Sanding Cast Iron Brackets / Agricultural Machinery Bracket Machined Iron Casting
Bracket Hinge Precision Investment Castings Hydraulic Cylinder Mounting Brackets
Steel Investment Casting Base End Hydraulic Cylinder Yoke End / Hydraulic Cylinder Fittings
Train / Railway Precision Investment Castings Wax Lost Steel Casting Train Connecting Rod