Place of Origin: | Mainland China |
Brand Name: | NC0893 |
Certification: | ISO9001,CE,SGS |
Model Number: | 0893 |
Minimum Order Quantity: | 100 pcs |
---|---|
Price: | Can talk |
Packaging Details: | Wooden Case |
Delivery Time: | 30 days |
Payment Terms: | T/T, L/C |
Supply Ability: | 80,000 pcs monthly |
Part Name: | Clutch Cover Housing | Material: | Ductile Iron |
---|---|---|---|
Application: | For Truck Clutch | Certification: | ISO9001:2015 |
OEM: | Available | Inspection: | 100% |
Ductile Iron Casting Function Clutch Cover Housing Truck Spare Parts Casting
Part Name | cast iron clutch cover housing |
Process | Resin sand casting, coated sand casting, investment casting, lost foam casting |
Casting process | Customer drawings → Resin sand casting / investment casting / lost foam casting → Heat treatment→ Machining → Inspection → Packaging and delivery |
Surface treatment | Polishing, painting, plating |
Heat treatment | Annealing, quenching, normalizing |
Machining | Large CNC lathe, CNC gantry milling, CNC gantry planer, CNC boring machine, cnc machining center |
Cast material | (1) Gray cast iron, ductile iron |
(2) stainless steel, carbon steel, alloy steel | |
size | Provide all dimensions or drawings as a customer |
standard | DIN,AISI,ASTM,BS,JIS |
prove | ISO9001:2008 |
service | Production samples; OEM / ODM |
MOQ | Small orders are acceptable |
weight | 20-10000KG |
application | Auto CAD,PDF, ProE(.igs,.stp),Jpeg,Jpg,Png |
Production capacity | 20,000 tons per year |
transport | Accept FOB or customer-designated shipping agent |
payment terms | T / T, L / C,Other |
Quality Control
Quality Control is one of the most important process in production. We insist that 100% inspection before
shipment and ensure parts without any flaws when sending out.
We have complete quality inspection facilities including mechanical testing, chemical analysis, tensile strength,
hardness, spectrometer, ultrasonic testing, etc.
FAQ
Q. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q. What is your terms of delivery?
A: FOB, CFR, CIF
Q. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Contact Person: Mr. Paul
Tel: +86-15867869948
Fax: 86-574-88923602
High Precision Investment Castings Transmission Box Cover For Power Transmission Machinery
Durable Grey Cast Iron Casting Cummins Exhaust Manifold For Diesel Engine / Cars Turbo
Customized Superior Quality Cast Iron Park Bench Legs for Outdoor Street Garden Furniture
Custom Cast Iron Hydraulic Cylinder Clevis Mount Cylinder End Mount For Truck Crane Forklift
Truck Parts Body Ductile Cast Iron Die Mold Sand Casting Process Engine Transmission Housing
CE AISI Sanding Cast Iron Brackets / Agricultural Machinery Bracket Machined Iron Casting
Bracket Hinge Precision Investment Castings Hydraulic Cylinder Mounting Brackets
Steel Investment Casting Base End Hydraulic Cylinder Yoke End / Hydraulic Cylinder Fittings
Train / Railway Precision Investment Castings Wax Lost Steel Casting Train Connecting Rod