Sunrise Foundry CO.,LTD

Profession makes things perfect!

Home ProductsScaffolding Accessories

Galvanized Scaffolding Replacement Parts Forged Cuplock Ledger Blade For Building Materials

Galvanized Scaffolding Replacement Parts Forged Cuplock Ledger Blade For Building Materials

  • Galvanized Scaffolding Replacement Parts Forged Cuplock Ledger Blade For Building Materials
  • Galvanized Scaffolding Replacement Parts Forged Cuplock Ledger Blade For Building Materials
  • Galvanized Scaffolding Replacement Parts Forged Cuplock Ledger Blade For Building Materials
Galvanized Scaffolding Replacement Parts Forged Cuplock Ledger Blade For Building Materials
Product Details:
Place of Origin: Mainland China
Brand Name: NC612
Certification: ISO9001,CE,SGS
Model Number: 612
Payment & Shipping Terms:
Minimum Order Quantity: 1000 pcs
Price: Can talk
Packaging Details: Customized
Delivery Time: 30 days
Payment Terms: T/T, L/C
Supply Ability: 150,000 pcs monthly
Contact Now
Detailed Product Description
Name: Cuplock Ledger Blade Material: Q235
Size: 48.3*3.0mm, 48.3*3.2mm, Etc. Length: 0.5m, 1m, 1.5, 2m, 2.5m, Etc.
Standard: EN74/BS1139/AS1576 Surface Treatment: Painting And Galvanized
High Light:

scaffolding fittings

,

formwork accessories

Scaffolding System Accessories Forged Cuplock Ledger Blade for Building Materials

 

Product Details

 

Material Q235 steel
Dimensions 0.192kg, or as your demands
Surface raw,HDG/galvanized, or as your request
Standard JIS,AS1576,ISO9001:2008
Feature Skidprood, Autirust, High Breaking Strength,Durable, easy to assemble & dismantle
Note OEM service is available
MOQ 1000pieces
Package woven bags or plywood box, or as your request
Payment Terms TT,L/C, we can contact in detail
Delivery Time 20-30days

Galvanized Scaffolding Replacement Parts Forged Cuplock Ledger Blade For Building Materials 0

 

Features
 
a.High strength welded cuplock scaffolding system is Q235 steel tubular scaffolding which can bear about 16 tons per set.
b.The surface of cuplock vertical and horizontal are full hot dip galvanized which is an efficient method to prevent rustiness and corrosion.
c.This steel scaffolding system is made of steel tube, cups and blades, which are precision drop forged.
d.The cups with gears can prevent the ledgers moving so that the whole system are stable without shaking
e.Verticals and horizontals can be combined at many angles in horizontal level so that cuplock is perfect for arc shape building construction.

 

About Us

 

Our company engaged in producing construction products such as scaffolding and formwork accessorries.

We have casting and forging workshop.Factory equipped laboratories, chemical composition, metallurgical

structure, hardness, compressive strength, yield strength and elongation for testing.

 

FAQ

 
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
 
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

 

 

 

 

 

 

Contact Details
Sunrise Foundry CO.,LTD

Contact Person: Mr. Paul

Tel: +86-15067447509

Fax: 86-574-88923602

Send your inquiry directly to us
Other Products