Sunrise Foundry CO.,LTD

Profession makes things perfect!

Home ProductsScaffolding Accessories

15 / 17mm Tie Rod Formwork Scaffolding Accessories Ductile Cast Iron Cone

15 / 17mm Tie Rod Formwork Scaffolding Accessories Ductile Cast Iron Cone

  • 15 / 17mm Tie Rod Formwork Scaffolding Accessories Ductile Cast Iron Cone
  • 15 / 17mm Tie Rod Formwork Scaffolding Accessories Ductile Cast Iron Cone
15 / 17mm Tie Rod Formwork Scaffolding Accessories Ductile Cast Iron Cone
Product Details:
Place of Origin: Mainland China
Brand Name: NC214
Certification: ISO9001,BV
Model Number: 214
Payment & Shipping Terms:
Minimum Order Quantity: 100 pcs
Price: $1-50
Packaging Details: Crate
Delivery Time: 30 days
Payment Terms: T/T, L/C
Supply Ability: 60,000 pcs monthly
Contact Now
Detailed Product Description
Product Name: Cone Material: Ductile Iron QT450-10
Color: Black,silver,yellow Match Tie Rod: 12/17/20MM Or Customized
Weight: 0.33kg/0.58kg Application: Fix Formwork Tie Rod
Surface: Natural,EG,HDG
High Light:

scaffolding fittings

,

formwork accessories

15/17mm Tie Rod Formwork Cone Ductile Cast Iron Cone / Steel Cone Nut for Construction Product

 

Application

 

Wing nuts and tie rods used for inner walls, outside of the template between tie withstand lateral pressure of concrete and other loads, ensure that the spacing inside and outside of the template to meet the design requirements, but also the template and its supporting structure fulcrum, so the bolt arrangement of integrity, rigidity and strength template structure of influence.

 

Specification

 

1.Material: nodular cast iron / steel

2.Surface: galvanized or natural colour

3.Base plate size: deponds on client's request

4.Formwork accessories: suitable for dia 15/17mm tie rod

5.Tensile strength: more than 195KN

6.Inspection: by ourselves or by SGS or B.V or others

7.OEM and Samples are available

15 / 17mm Tie Rod Formwork Scaffolding Accessories Ductile Cast Iron Cone 0

 

Our Service

 

1.Your inquiry related to our product & price will be replied within 24hours.

2.Well-trained & experienced staffs are to answer all your inquiries professional in
English of course.

3..All of our goods will pass THREE QUALITY INSPECTIONS before shipment.

4.Excellent quality and Competitive price,OEM is highly welcomed. We have strong
R&D team here to help.

5.Less than one container loading is accepted.

6.On time delivery, in general 25-40 days.

7.Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipment.

 

FAQ

 

Q: How long is your delivery time?
A: Generally it is 10-30 days if the goods are in stock.


Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.

 

 

Contact Details
Sunrise Foundry CO.,LTD

Contact Person: Mr. Paul

Tel: +86-15067447509

Fax: 86-574-88923602

Send your inquiry directly to us
Other Products